
There was a healthy turn-out to a meeting from people keen to see copies of the latest Lower Thames Crossing design consultation.
The event, organised by the Gravesham committee of CPRE Kent and Meopham residents, gave all the chance to ask questions about the revised design proposals. It had been set up in view of Highways England’s belief that the documents being displayed only in Rochester Library was sufficient south of the river.
None of the many visitors at the meeting, held at Meopham Cricket Pavilion on Friday, July 31, realised that the junction of the tunnel access road and A2 would result in the A2 being reduced to two lanes in each direction at this point.
This pinch point is likely to cause huge congestion on the A2 and as a result greatly increase traffic on local roads such as the A227.
- You can read more on the latest consultation here
Monday, August 10, 2020
