The scheme targeted for the Swanscombe peninsula (pic LRHC)
The developer behind the proposed London Resort theme park has been accused of failing to provide enough information about the impact of increased traffic on road and rail in north Kent and London. In damning submissions from leading transport organisations to the Planning Inspectorate, it is suggested that transport infrastructure could be overwhelmed by traffic from the development, on the Swanscombe peninsula. Highways England says there has been “insufficient information” to allow conclusive statements on traffic impact, citing junctions 2 and 30 of the M25, the A13/A1089 junction and the A2/M2 east of the M25 as potential problem spots. Transport for London, meanwhile, has slammed London Resort Holding Company’s lack of an “appropriate assessment methodology”, saying it could mask “significant impacts that must be mitigated”. It said: “The failure to use appropriate modelling means that impacts on the rail and Underground network have not been assessed with any degree of certainty. “The arbitrary assumptions about the scale of traffic that will use the north Kent lines risks ignoring potential impacts at their central London termini and on interchange flows at Abbey Wood (to the Elizabeth line).” It also warned that the development could cause congestion on north Kent roads and lead to problems at east London road tunnels. For its part, Network Rail was concerned about impact on stations close to the planned development as well as the effect on the Ebbsfleet Southern Link and HS1. As if all that were not enough, the C2E Partnership feared that the scheme could take up land earmarked for a potential Crossrail extension to Ebbsfleet. A list of Relevant Representations was published on Planning Inspectorate website in April after its deadline for comments had passed.
The Swanscombe peninsula has a superb array of natural habitats… CPRE Kent would like it to stay that way (pic Paul Buckley)
The developer behind the proposed London Resort theme park on the Swanscombe peninsula is ploughing on with the project, although it will be changing its plans after the location’s designation as a Site of Special Scientific Interest (SSSI). London Resort Holding Company has been granted an extra four months to submit revised documents in its bid for a Development Consent Order from the Planning Inspectorate, meaning examination of the project is now likely to begin in September. It is reported by the BBC that LRCH does not intend to make any “material” changes but will be amending almost half of its 460 submission documents. A letter to the Planning Inspectorate shows that 11 documents will be replaced or have “substantive” updates, 46 will receive “some amendments” and about 160 “minor amendments”. Some 250 documents will not be changed, says the BBC. If the report is correct, LRCH’s latest proposals fall very far short of meeting an appeal by CPRE Kent and three other conservation charities, who have said in a joint letter to the Planning Inspectorate that LRHC “should have sought to withdraw their existing application and restart the pre-application process” after the SSSI designation. The letter has been signed by CPRE Kent, Buglife, Kent Wildlife Trust and the RSPB. Jamie Robins, of Buglife, said: “There is so much change here, it is hard to argue that it doesn’t warrant resubmission and fresh consultation.” He urged LRCH to consider other locations as “you cannot replace these habitats”. Natural England, which made the SSSI designation, said some 40 per cent of the site would be lost to the theme park, while there would be probable further impact from construction and operation. Transport and river navigation assessments will also receive “substantive updates” in response to concerns from Transport for London, the Department for Transport and the Port of London Authority. The Save Swanscombe Peninsula campaign says LRHC appears to be “using the extension as an opportunity to try and address big holes in the original application and not just regards their devastating impact on biodiversity”. With the six-month examination of the DCO application due to begin in September, the final decision on the project – by Robert Jenrick, Secretary of State for Housing, Communities and Local Government – will be made next year.
To read the letter from CPRE Kent, Buglife, Kent Wildlife Trust and the RSPB, click here
The wait is over – the spring edition of Kent Countryside Voice is with us! Features on the glory of hedgerows, possible ways to tackle the county’s water crisis and the threat posed by a planned theme park to a wildlife haven are among a cornucopia of treats for all who treasure our county’s countryside. So settle back with a brew or your favourite tipple and enjoy a great read here
The peninsula hosts some wonderful natural habitat (pic Paul Buckley)
The Swanscombe peninsula – the area of north Kent being targeted for the building of the country’s largest theme park – has been designated a Site of Special Scientific Interest (SSSI). National England announced today (Thursday, March 11, 2021) that the peninsula’s “nationally important invertebrates, breeding birds, plants and geology” warranted such recognition. The government advisory body said: “The 250 hectare site, alongside the Thames Estuary, forms a corridor of habitats connecting Ebbsfleet Valley with the southern shore of the River Thames between Dartford and Gravesend. “The site has an incredible assortment of grassland, scrub, wetlands, grazing marsh and saltmarsh habitat in a relatively small area, providing ideal conditions for a unique variety of wildlife. “The area is home to over 1,700 invertebrate species, which includes over a quarter of the UK’s water beetle species and more than 200 species that are considered of conservation importance. It is one of just two places in the UK where the critically endangered distinguished jumping spider is found. “The rich and varied habitats on the peninsula also provide great conditions for breeding birds such as marsh harrier and bearded tit, and for nationally scarce plants threatened with extinction in Great Britain, such as the divided sedge and the slender hare’s ear.” James Seymour, NE’s Sussex and Kent area manager, added: “The designation of Swanscombe Peninsula as an SSSI is great news for one of the richest known sites in England for invertebrates, ensuring essential refuge for many rare and threatened species that sadly are not able to thrive in the wider landscape. “Right on the doorstep of some of our most densely populated towns and cities, this new SSSI will also offer wonderful opportunities for people to connect with nature via the England Coast Path. “This area is living proof that some of our most important species can thrive hand in hand with businesses and transport infrastructure. Special places like this will form the vital backbone of a national nature recovery network.” The new Swanscombe Peninsula SSSI includes the previously-designated Bakers Hole SSSI, which covers 6.9 hectares with geological and archaeological features. The designation is undoubtedly good news, but this is only the start of the process, not the end, as there will now be a four-month consultation before potential SSSI confirmation. Natural England said: “As of 11 March 2021, the SSSI has been formally notified to landowners and occupiers and other interested parties. “There will be a 4 month period in which anyone can make representations or object to the notification. If all objections are resolved or none are submitted, the designation will be confirmed. If there are unresolved objections the Natural England Board will hear all of these; they must then decide whether to confirm the designation (with or without reductions). “If the notification is not confirmed within 9 months of the date of notification, the notification falls.” And, in a clear reference to the proposed London Resort theme park, it said: “Natural England recognises that there is interest and consideration of potential development opportunities in the Swanscombe area. “Designation of this site for its nationally important wildlife features is an important step towards ensuring that its environmental value is recognised and taken due account of in any future planning decisions.” In January, the Planning Inspectorate accepted the application by London Resort Company Holdings for a Development Consent Order to build the London Resort theme park on the peninsula.
Announced to huge fanfare in 2012, the proposed London Resort theme park at Swanscombe appears as far from fruition as ever, a fact noted gloomily in a report advocating colossal urban development in north Kent.
The developer behind the theme park, London Resort Company Holdings, has revealed that it is delaying its application for a Development Consent Order until 2019.
It reportedly did not “sufficiently estimate” elements that could affect its plans for the 535-acre site.
In an indication of the extraordinary development pressure on the area, LRCH has pointed to three neighbouring proposals, including proposed changes to the A2 and the Lower Thames Crossing, for the delayed application.
Whatever the reasons, it seems support for the developer is waning.
Dartford MP Gareth Johnson said: “Dartford is losing patience with LRCH and its proposed theme park.
“This latest delay is just one in a series of postponements that has created uncertainty for the existing businesses on the Swanscombe peninsula and makes LRCH look incapable of ever delivering this project.
“I have always felt the jobs that could come from a leisure facility on the peninsula would be very welcome, but I have yet to see evidence of how the local area would cope with the extra people and vehicles it would bring.
“The concept of a theme park was initially welcomed by local people, but this uncertainty is becoming intolerable.”
The delayed submission date will presumably not go down well with the Thames Estuary Growth Commission, which is calling for “a minimum” of a million homes to be built in the estuary by 2050.
This advisory body to the government declares in its 2050 Vision report that a DCO application for London Resort should be made “as soon as possible”.
“Should an application not be submitted by the end of 2018, the government should consider all the options for resolving the uncertainty this scheme is creating for the delivery of the wider Ebbsfleet Garden City,” it says.