Aircraft noise – important debate

Campaign group Gatwick Obviously Not has been lobbying Gatwick to fully implement the findings of the Arrivals Review .

This set out 23 practical steps to improve noise, the key recommendations are:

  • To reduce the number of aircraft holding over land
  • To improve use of continuous descent arrivals which would generate significantly less noise, and increase the sequencing and spacing of arrivals
  • To accelerate the modification of the Airbus A320 family of aircraft to reduce the whining noise they make during the approach phase of flight
  • To establish an independently chaired noise management board to oversee joint strategies to deal with noise around the airport
  • To develop a comprehensive online complaint management system

Now four MPs have written to National Air traffic services and the Civil aviation Authority to ensure these are implemented in full. See the letter here: http://www.gatwickobviouslynot.org/

Photo by Chris Sampson

Photo by Chris Sampson

Plus Tom Tugendhat MP has secured a Debate in Westminster Hall (in the Palace of Westminster) tomorrow (Wednesday 20th April) at 9.30am on ‘The effect of aircraft noise on local communities’:

http://www.parliament.uk/mps-lords-and-offices/offices/commons/speakers-office/wadjourns/

This is all good news for communities in Kent who have been blighted by aircraft noise and Gatwick should work fully with NATC and the CAA to ensure everything is done to alleviate this.

Gatwick is running a community engagement plan – find out how you can get involved here:

http://www.gatwickairport.com/business-community/aircraft-noise/airspace-overview/arrivals-review/

April 19th 2016


Disappointment in response to community appeal petition

We are disappointed in the Government response to the community right of appeal petition so many of you have been signing.
The Government “does not believe that a right of appeal against the grant of planning permission for communities, including parish councils, is necessary. The Government considers that communities already have opportunity to guide and inform local planning issues via Local Plans and Neighbourhood Plans, and it would be wrong for them to be able to delay a development at the last minute, through a community right of appeal”.
The Petitions Committee (made up of 11 MPs) will take a look at this petition and its response and could still press the government for action and gather evidence.
Read the full response here.
April 19th 2016.

Stour Park will harm landscape and heritage

We have raised concerns about the huge scale of a planned warehouse development near Ashford and its impact on the important landscape and heritage setting.

The developers of Stour Park, Friends Life Ltd, have applied for permission to build enormous warehouses, 16 metres tall and covering an area the size of 31 football pitches (160,000 sq m). The site, next to Sevington and Mersham villages, is identified for commercial development in the local plan.

Sevington, photo The Village Alliance

Sevington, photo The Village Alliance

We are concerned that the masterplan does not provide sufficient guidance to ensure that the harm to sensitive heritage, landscapes and communities is minimised and appropriately mitigated. The site is close to the medieval grade 1 listed St Mary’s Church and the North Downs Area of Outstanding Natural Beauty. It is essential that a sensitive approach to important views (heritage and landscapes), ecological mitigation, landscaping and building heights, colour, materials and orientation are agreed from the outset.

St Mary's Church, Sevington, photo The Village Alliance

St Mary’s Church, Sevington, photo The Village Alliance

Chairman of CPRE Kent’s Ashford Committee, Dr Hilary Moorby said: “We need to protect the setting of this important church and the AONB. The sheer scale of these giant buildings will change this beautiful rural area dramatically and everything possible must be done to minimise the harm.” Continue reading

Fascinating outings for our members in 2016

We have a great programme of outings planned for our members. Organised by volunteer Margaret Micklewright, they include fascinating visits to the COOK’S kitchen at Sittingbourne where they make frozen food for distribution across Kent and beyond. (Thursday 19 May).

Cooks at COOK

Cooks at COOK

On Thursday 18th June an outing is planned to Lullingstone Castle and its World Garden of Plants, plus a visit to a lavender farm in the area.

 

Lullingstone Castle aerial view

Lullingstone Castle aerial view

Plus on 14th June (to be confirmed) members have the chance to visit the Sainsbury’s Distribution Centre at Waltham Abbey.

On Wednesday July 27th there is an outing to Povender House near Faversham. This 14th century house is owned by Princess Olga Romanoff, daughter of Prince Andrew Romanoff, the eldest nephew of Czar Nicholas II. The visit includes a tour and tea and cakes.

Then on Thursday September 15th there will be a visit to Denbies Vineyard and then on to Painshill Gardens.

Painshill Gardens

Painshill Gardens

Denbies Wine Estate

Denbies Wine Estate

In the autumn on 1st October members have the chance to visit the Sainsbury’s Distribution Centre at Waltham Abbey.

For a full programme and booking form see the attached below:

Diary outings 2016 revised May 2016

May 3rd 2016.

The housing crisis – a builder’s view

The following article by Susannah Richter appears in the latest edition of Kent Voice. We would be interested in your feedback.

Unrealistic housing targets are putting more pressure on the housebuilding industry than ever before. In Kent, the total 20-year figure is 158,500 new homes, with recent objectively assessed housing need of 18,560 in Maidstone, 15,600 in Thanet, 16,000 in Canterbury and 29,500 in Medway. The industry is dominated by the big companies, so what are the barriers faced by small and medium sized builders and can they provide solutions to the housing crisis?
Pentland Homes was set up by landowning farmers in the 1970s and now builds around 100 homes a year, up from just 30 during the recession five years ago. Most of its development sites are brownfield (79%) – including empty schools, a disused factory, a former pub and MoD land.
But Managing Director Martin Hart says brownfield sites are complicated: “Firstly, they are bought at risk because we don’t know what problems we may find. We are currently building on the site of an old potato packing plant at New Romney which was entirely concreted over – we didn’t know what to expect when we removed the concrete. If something untoward was found, a small company could go bankrupt on just one unlucky brownfield buy.

Martin Hart

Martin Hart

Pentland Builders

Pentland Builders

“Secondly, if a site has been brownfield for a long time it often has greater ecological value than greenfield land which has been ploughed and treated. We have to get ecologists involved and it can be costly if we need to move or provide for species or could even prevent planning permission. Either way it will cause delay – again something many small building companies cannot afford.”
This is exactly what happened at Lodge Hill, a former army camp in Medway identified for 5,000 homes. Over the last 20 years it has become home to 1.3% of the national nightingale population as well as bats, great crested newts, toads, lizards, slow worms, grass snakes and adders. This will be the subject of an interesting planning inquiry. Continue reading

Kent Voice spring edition out now

The latest edition of Kent Voice is landing on doorsteps this week. it is a particularly colourful edition with lots of photos of spring flowers, our lovely countryside and farmland and bees! One of our articles is on the saga of bees and neonics. Plus we have an interesting perspective on the housing crisis – we talk to two builders about the challenges they face.

Kent Voice cover, spring 2016

Do have a look to find out the latest branch news and campaign updates. You can read your copy here.

March 29th 2016.


Strongly opposed to damaging new crossing

CPRE Kent has raised significant concerns about the proposed Lower Thames crossing including fears over air quality, transport, devastation of areas of countryside and the complete failure of strategic planning which means it won’t even solve the problem.

Responding the Highways England consultation, we have stressed that we are strongly opposed to option C (bored tunnels from Gravesend) but we would also oppose option A at Dartford because of the longer-term induced traffic growth, congestion and reduction in air quality.

Artist's impression of the bored tunnels

Artist’s impression of the bored tunnels

Director Hilary Newport said: “The planned crossing would damage important areas of countryside that are a vital ‘green lung’ to the urban population of the Medway towns, providing recreation and the opportunity for quiet enjoyment of the countryside which is so important for physical and psychological health.”

These areas include ancient woodland and Metropolitan Green Belt. There would also be an impact on the wider area, a loss of amenity in and around Shorne Country Park and the open landscapes to the north.

Post Opening Performance Evaluation (POPE) studies for new roads schemes have repeatedly shown that new road routes do not just relieve congestion, but create and attract new traffic.

There is already an over-reliance on the channel corridor and the channel crossings for the transport of goods to and from Europe. This should be an issue of national concern for the UK’s resilience and security. Not only is there the need to implement Operation Stack during periods of disruption, but even during normal operations, the Dover ‘Traffic Assessment Project’ (’Dover TAP’) is frequently used to hold back port-bound HGVs on the A20 to limit congestion and air pollution in Dover Town Centre. This of course simply displaces the same congestion and air quality concerns to other parts of the roads network. Continue reading

Concerns about Maidstone Local Plan

CPRE Kent has said it is concerned about the scale of development – 18,560 new homes – proposed in the Maidstone Local Plan.

Responding to the Maidstone Local Plan Pre-Submission document, we also raised the following concerns:

  • the absence of sound supporting evidence
  • the accompanying draft Integrated Transport Plan has not been agreed with Kent County Council or the Maidstone Joint Transportation Board
  • the cost of providing much of the necessary supporting infrastructure is unknown and there is no guarantee that statutory contributions will cover the cost
  • the Gypsy and Traveller and Travelling Showpeople Accommodation Assessment has not followed government guidance.

Harrietsham sign by Gregory Williams View near Staplehurst by fraser Elliot

Photos above: Harrietsham sign by Gregory Elliot and view near Staplehurst by Fraser Elliot

Most of the housing (84%) is allocated on greenfield land and this approach will not encourage the development of brownfield and previously developed land. The scale of residential development in villages and rural settings is disproportionate to their size, and is unlikely to promote sustainable journeys and more likely to increase traffic on the roads.

Finally, we are very concerned that land at Woodcut Farm close to junction 8 of the M20 is allocated for employment – this is an unsuitable location for development as agreed by the inspectors who considered the Kent International Gateway proposal, and the recent Waterside Park application.

Chairman of the CPRE Kent Maidstone Committee Gary Thomas said: “This local plan is already having a terrible impact on villages and countryside. It would cause enormous traffic problems and a strain on school, health and travel facilities. The number of new homes is unrealistic and unsustainable. There will be a loss of greenfield land, much of it valuable farmland and the beautiful landscapes so important to the character and enjoyment of our county.”

Read our full submissions here and here.

March 23rd 2016.


M20 Junction 10a

CPRE Kent’s Ashford Committee has submitted comments on the proposed new Junction 10a of the M20.

We are concerned about the effect the new junction would have on the wider road network, particularly the Romney Marsh road and the country lanes around Mersham.

Chairman of the Ashford Committee Hilary Moorby said: “It is imperative that the village of Mersham is protected from the village lanes becoming rat runs to the M20. It is also important that a buffer of open countryside between the village and the industrial site U19 (Stour park) is provided.”

M20 approaching Junction 10

M20 approaching Junction 10

Mersham Parish Council has requested that the link between Kingsford  Street and Highfield Lane be closed and we support this.

We also want to know the exact effect on public rights of way and need details of any permanent closure or realignment so that the needs of pedestrians, horses and cyclists can be assessed and provided for.

We are calling for safety measures on the Barrey Rd/A2070 Junction, including traffic lights, a strict enforcement of the proposed 40mph speed limit  and a lane restricted to hospital traffic only.

We also want more done to mitigate the damage to the existing environment and protect the important wildlife on the site.

You can read our full comments here.

March 21st 2016.


Brownfield sites developed six months faster than greenfield sites

Research published today (March 21st) by CPRE shows that brownfield sites are being developed more than half a year faster than greenfield sites. [1] This follows on from CPRE research carried out in late 2014, which found that there are enough suitable brownfield sites for at least 1 million new homes. [2]

It is estimated that Kent has 1,600 hectares of brownfield sites which could accommodate at least 70,000 homes. Much of this is in North Kent – in particular Dartford and the Medway Towns, but also Dover and Tonbridge and Malling have a lot of sites.

The new research covered 15 local authorities across England between March 2012 and December 2015. [3] Carried out by construction consultants Glenigan, the data reveals that the time between planning permission being granted and construction work starting is generally the same for brownfield and greenfield sites, but that work on brownfield sites is completed more than six months quicker.

Nova site Faversham VE (5)

While the Government has pledged to invest more than £2 billion in brownfield regeneration and establish a brownfield register, many of its proposed changes to planning policy are aimed at making it easier to build on greenfield land. [4] These proposals include developing small sites in the Green Belt and a ‘housing delivery test’ that would force councils to release more land for development if housebuilders do not meet high housing targets. Continue reading


Last day to sign important petition – give communities a voice

You have just today left to sign an important petition calling for parish councils to be given the right to appeal planning decisions to the Planning Inspectorate. we are strongly supporting this because the current planning system is unfair.

Kent aeria photo by Vicky Ellis

Kent aerial photo by Vicky Ellis

CPRE has long called for a limited community right of appeal in areas where a development is non-compliant with a neighbourhood plan or local plan. Currently parish councils and other community groups have the power to produce neighbourhood plans, but no scope to stop developers overriding this by putting in speculative planning applications for approval by the district council. Budget cuts within local authorities mean that they are under increasing pressure to allow large developments, even when these are not in line with the community’s aspirations for the future of its area. Continue reading

Lower Thames Crossing – thoughts from Gravesend

Hundreds of people turned out to a public meeting at Gravesend last night to hear about the consultation on the Lower Thames Crossing. I was pleased to be on the ‘top table’ alongside Highways England Consultation Manager Martin Potts to be able to put CPRE Kent’s case for a more sustainable transport strategy, and grateful for the support and kind words of the audience.

It was never my intention to speak at this meeting to argue the relative merits of either Option C (HE’s preferred option of a tunnel east of Gravesend – look at the picture below for a very benign ‘artist’s impression’ which leaves out all of the industrial infrastructure, lighting, power substations etc etc) or Option A, which is more capacity at Dartford.

Our response to the consultation is going to make it absolutely clear that we believe both choices offer unacceptable environmental damage, blighting lives and livelihoods, against a backdrop of already intolerable levels of air pollution from traffic.

Lower Thames Crossing image

No-one doubts the huge problem of congestion that already exists in north Kent, and it is a problem that needs solving now.  But I want to consider whether the only solution to this problem is an expensive and damaging new road crossing, wherever it might be.

To help explain our reasoning, I’m focusing on  the issue of road freight.  About a quarter of the vehicles using the current crossings are HGVs and goods vans; as a nation, we are heavily reliant on road based freight: The efficient flow of goods and services is essential to UK and wider economies, of course. But the number of HGVs that travel through the channel crossings each year is already growing at about 8% per year, and the port of Dover has ambitious plans for expansion.  This continued (and unconstrained) growth appears to be happening in wilful ignorance of the consequences for the wider highways network, the environment, or the health and wellbeing of our communities.

Most of this road-based freight using the channel crossings has to cross the Thames; very little has its origins or destination in Kent. The short crossing across the Channel is quick and cheap for the freight companies, but the real costs arising from ever more traffic are borne by the environment and the communities along the rest of the route. This traffic brings no real economic advantage to Kent, just pollution, noise and congestion which is potentially now requiring a very expensive ‘fix’.

A new Thames Crossing might ease current congestion, and accommodate traffic growth for a while, but we know that all new roads fill up, and they fill up quickly.  It would be a shame to lose sight of the lessons we’ve learned from the past. A good example is Newbury Bypass, notorious in the mid-1990s for the protests that made Swampy and his colleagues famous as they climbed trees and dug holes to try to stop the diggers starting work.

The Promoters of the bypass argued it was essential to improve road safety and to end the intolerable congestion in Newbury town; the objectors were fighting to stop the destruction of 120 acres of mature woodland and sensitive habitats. Despite the the objections, the bypass received go-ahead in 1995 and finally opened in 1998.

The studies that took place after the bypass was opened make grim reading. Traffic on the bypass grew at double the rate of traffic on comparable roads in the area, and there is clear evidence that this was induced growth (i.e. new journeys) rather than traffic that was displaced from other congested roads. Within 7 years, the traffic in Newbury town centre was back to its pre-bypass levels, the accident rate in the area was up, and the species of rare snails that had been expensively relocated were found to be locally extinct. 10 years on and with £100m spent, the situation in Newbury was worse than before.  There are many similar examples where promised befits of road schemes did not deliver.

So before we make a commitment to a new road we need to ask whether it will do what is promised.

If you are responsible for trying to tackle congestion or manage transport networks, it’s important to look to the lessons learned to understand whether new road building will help or hinder those aims.

If you are responsible for managing public expenditure, you need to know whether public money is actually delivering public benefits.

And those of us who are the target for the current consultation all need to be confident that a road scheme will genuinely improve conditions, before we can even begin to weigh up the environmental damage against those benefits.

Induced traffic is a reality: The introduction to the Consultation Document highlights the importance of “stimulating economic growth – unlocking access to housing and job opportunities”.  But I think that there is a very important difference between unlocking genuine potential on the one hand, and on the other, creating a vacuum that pulls in unsustainable growth into the already overstressed south east, just as the Newbury bypass pulled in traffic growth for no long-term improvement in congestion.

Rather than focusing on ever-more roads, which will be as full as ever before long, we are calling for a serious re-think and for a genuinely sustainable integrated transport strategy that doesn’t foster and encourage the growth of road-based freight through Kent.  We should certainly focus on getting more freight off road and onto rail. The Consultation Document (p 10) makes it clear that rail has been ruled out, on the basis of earlier studies dating back to 2009: I think that this is an appalling throwaway decision which flies in the face of any definition of sustainability.

Things have changed since 2009.  If we are at risk of forgetting the lessons we learned at Newbury, are we also at risk of forgetting last year’s experience of sweltering through over 30 days of summer with Operation Stack paralysing the county’s roads?  The transport links on which we rely are clearly not resilient and unconstrained growth of ‘business as usual’ just isn’t an option any longer.

Before we commit to any damaging road building scheme, it’s time to re-think the practice of concentrating so much of the nation’s trade through such constrained and unsustainable links: we are putting all our eggs in a frankly fragile basket.  60% of all UK freight travels on HGVs via the channel crossings: most of this is travelling to or from places north of the Thames: some of it even crosses at Dover to travel on to Scotland or even Ireland – the fact that this is the cheapest option available for hauliers to move their stuff from ‘A’ to ‘B’ makes it quite obvious to me that our transport systems are blisteringly unsustainable.

So instead of another Thames Crossing, let’s look at ways to incentivise smart use of ports of entry and exit that don’t rely on onward road travel across the Thames, (London Gateway is rapidly expanding, Harwich or Felixstowe could take more freight, Liverpool is crying out for more custom). Let’s move goods in/out much nearer to their points of destination or origin; we could do a great deal to restore resilience to our existing transport network as well as cutting the existing congestion and pollution.

We need a solution that will serve us well into the 21st century, not just a continuation of ‘business as usual’ that will at best give us some short term benefit for all sorts of very real and lasting harm.

The last gentleman who stood up to speak last night made a brilliant statement.  He made it very clear which option we need.  We need ‘Option Sea’.  Sir, I salute you.

To read more on our view on the LTC click here.

Hilary Newport
March 3rd 2016.

 


Huge solar farm refused over landscape and heritage concerns

Good news – Maidstone Borough Council has refused an application for a 29,400 panel solar farm across 28 acres of agricultural land at Great Tong Farm.

We were concerned about the impact the site would have on the landscape and the heritage of the area – the site would be seen in views from the Greensand Ridge and was in close proximity to 23 listed buildings – including seven on Tong Farm itself.

Solar farm in Europe, photo flickr

Solar farm in Europe, photo flickr

The site lies in the Special Landscape Area of the Low Weald and Greensand Ridg and is bordered by three public rights of way. Headcorn’s built environment is 76 hectares. Proposed development would equate to 15% of this figure, increasing to 27% in conjunction http://trueviagraonline.com with the 220 homes already granted permission on Tong Farm.

The Kent Historic Buildings Committee, part of CPRE Kent, raised concerns on the setting of heritage assets on Tong and the wider landscape including Grade 1 Ulcombe Church. The objection stated “a considerable number of buildings stand to be affected, both individually, and as a group, and we would say the total effect of the proposal on the heritage environment is substantial”.

Historic England said the solar array would cause “modest harm to the significance of these listed buildings by altering the context that explains their historical purpose”. The site would be visible from Grade 1 Ulcombe Church, classified as an “important view”.

March 1st 2016

 

Evidence on Operation Stack submitted to Transport Select Committee

CPRE Kent has submitted a written response to the Government’s Transport Committee inquiry on Operation Stack.

This follows last October’s one off evidence session into the impact of Operation Stack following the chaos of last summer.

In November 2015 the Chancellor of the Exchequer announced funding up to £250 million for a permanent lorry park to increase resilience in Kent, by taking pressure off the roads in the event of Operation Stack. The Government is consulting on a preferred site at Stanford and other alternatives. In the short term, the former Manston Airport site will continue to be used as a lorry park.

 

Operation stack 035 Operation stack 036

CPRE Kent holds to the principle that a single permanent lorry park which is used only in the event
that Operation Stack needs to be implemented is the wrong solution to the wrong problem. Kent is
an inevitable and unavoidable bottleneck in the flow of traffic between the UK and the rest of
mainland Europe, and the high and rising volume of road-borne freight transiting the county is the
most important issue that needs to be addressed.
The disruptions to Kent and the UK’s economy, as well as the unacceptable impacts on local lives and livelihoods, that resulted from the lengthy implementation of Operation Stack in 2015 served to
demonstrate the fragility of the logistics industry’s reliance on this concentrated route. We contend
that the time has come for a solution which would offer real resilience to the nation’s trade and
transport links and offer flexible alternatives to the logistics industry, both now and in the future.
We propose a 21st Century solution to the problems of over-concentration of road-based HGVs in
Kent.

To read our full submission click here.

For details of the inquiry click here.

February 29th 2016

Lower Thames Crossing debate

We will be debating the proposed new Lower Thames Crossing at an important public meeting next week.

Wednesday, 2nd March
St John’s Catholic Comprehensive School, Rochester Road, Gravesend, Kent DA12 2JW

Doors open 18:00 for 19:00 start

Lower Thames Crossing image

Organised by Gravesham Neighbourhood Forums, the speakers are CPRE Kent Director Hilary Newport and Highways England Consultation Manager Martin Potts. The meeting will be chaired by journalist Iain McBride with maximum time for questions.

QE2 Bridge by Diamond Geezer, flickr

QE2 Bridge by Diamond Geezer, flickr

Meanwhile we have raised our concerns about the implications for pollution of the proposed new crossing.

Alex Hills, Chairman of the Dartford and Gravesham branch of CPRE Kent, said: “We all know that pollution is a killer with the young most at risk and yet the route being promoted passes many schools. We find it baffling that Highways England is not going to do a full modelling of the impact on air quality until after the route has been chosen.”(1)

Highways England documents state that no parts of the south east meet the ambient air quality directive(2) and Gravesend and Rochester town centres already exceed safe pollution levels. Experts calculate that pollution accounts for 40,000(3) early deaths a year. Research has proven that pollution can cause asthma, strokes and heart attacks, so should be regarded as a serious health issue.(4)

It is for this reason the government is supposed to be working towards reducing UK emissions by 60%.  Air pollution reduces brain function and development in children(5). A new tunnel and the associated road network leading to and from the tunnel will only lead to a worsening of air pollution levels in Kent and Essex.

Alex Hills said: “The increasing evidence on the effects of air pollution on people’s health makes the government’s insistence on a new road crossing indefensible. There needs to be a proper study into the alternatives. We have called for a sustainable transport strategy to ease congestion not just here but on the M20 and at Dover too.”

(1)Highways England document volume 6.4.3.6

(2)In 2015 the Supreme court ruled the UK had been in breach of the Ambient Air Quality Directive 2008/50/EC since 2010

(3)Royal College of Physicians-Channel 4 Despatches 22.2.2016

(4)Queen Marys Hospital London, Professor Jonathan Grigg and Edinburgh Royal Infirmary Professor David Newby, Channel 4 Despatches 22.2.2016

(5)Pompeu Fabra University Barcelona Professor Jordi Sunyer- Channel 4 Despatches 22.2.2016

For more information on our policy position click here.

February 25 2016.